NVIDIA Vera Rubin Power: 110 kW Shelves, Cooling and 800 VDC
What 110 kW power shelves tell us about NVIDIA Vera Rubin, how CoreWeave manages cooling, and why the 800 VDC roadmap needs its own timeline.
Every article we've published — newest first.
What 110 kW power shelves tell us about NVIDIA Vera Rubin, how CoreWeave manages cooling, and why the 800 VDC roadmap needs its own timeline.
MediaTek will use NVLink Fusion for custom AI accelerators. What the $3.5 billion NVIDIA bond investment confirms, and what remains undisclosed.
T5 Construction becomes EverOn DCS as Salute agrees to buy T5 Operations. What the deal covers and what its revenue and capacity figures mean.
NVIDIA's 800 VDC architecture for H2 2026: sidecar power shelves, solid-state transformers, and the OCP requirements before GB300-class racks can use it.
AFC and Vision Invest back WIOCC with $300 million for African data centres, fibre and subsea assets. Here is what the deal discloses.
OpenAI's Georgia power deal, NextEra's reported AI savings and Santee Cooper's forecasting plans show different stages of grid flexibility.
Prometheus Hyperscale and Istmo Energy plan a 1.5 GW behind-the-meter AI campus in Reeves County, with first power targeted for 2027.
One Nuclear signs a binding LOI for a 2.88 GW natural‑gas plant and 700 MW battery storage to power a pending data‑center campus in Louisiana.
Exascale Labs and EnergyBank sign an MOU to test an off‑grid 800 kW AI data centre on Norway’s first floating wind turbine, with a roadmap to 10 MW per turbine.
Flag drops GCX, invests $250 M and expands Pacific routes to serve AI‑driven data‑center traffic.
Vietnam's data centres are drawing billions in AI investment, but the buildout depends on a single submarine cable route and a tightening power supply.
Amazon secures nearly 200 MW of wind power in Sweden, pushing its renewable portfolio toward 1 GW to fuel expanding AI‑intensive data centres.