PJM Data‑Center Strategy: Grid Expansion vs. AI Load Surge
How PJM balances new generation, interconnection reforms and curtailment rules to accommodate AI data‑center growth.
Every article we've published — newest first.
How PJM balances new generation, interconnection reforms and curtailment rules to accommodate AI data‑center growth.
A data‑center‑focused look at Cerebras’s WSE‑3 Turbo over‑clock, its PFLOPS output, power delivery and how it changes rack architecture compared with NVIDIA’s GB300 NVL72.
Micron unveils a $10 billion AI memory research campus in Boise, Idaho, and what it means for AI compute power density.
PJM caps its Sept-Oct backstop auction at $555/MW-day to close a 6.8 GW gap, and DOE keeps Eddystone online through Nov - both driven by AI data-center demand.
We break down the $3‑4 trillion AI capex forecast, the $500B financing coalition, power demand spikes and revenue gaps shaping the AI build‑out.
GB300-class racks hit 142kW and outrun a standard 60-80kW CDU. The 51V DC busbar, 33kW power shelves and CDU sizing direct-to-chip cooling needs.
We break down the Manchester edge data‑center proposal, home‑based GPU networks, and EdgeCore's power and networking strategies for AI workloads.
We break down Terranova’s 300MW Campus Campinas – power specs, investment, cooling tech and what it means for Brazil’s AI infrastructure.
Nvidia’s $500B AI-infrastructure pledge and DSX-driven Cloverleaf stake reshape U.S. data-center site and power planning.
Zayo expands its Corning fiber deal to fuel a 15,000-mile AI network buildout through 2030, adding over 8,000 miles of long-haul fiber with Nvidia.
Break down Edgecore's own‑power stance, TVA's new data‑center rate and capacity charge, and PJM's 50% wholesale price jump with specific numbers and dates.
Trane and Eaton's integrated power-cooling reference design and Castrol's NVIDIA-validated PG25 fluids target efficiency and cooling for AI data centers.